Assess before installation
Review condition, level, moisture considerations and compatibility with the proposed system.
Specified commercial floor and wall preparation, levelling, boarding and waterproofing ahead of tile installation.
A durable tiling installation starts with the right background. Preparation is assessed against existing site conditions, tile formats, required tolerances and the specified system.
We price appropriate projects from the drawings, specification, substrate information and programme. Any work outside the agreed tiling package is identified before commitment.
Review condition, level, moisture considerations and compatibility with the proposed system.
Plan suitable repairs, levelling, boards, membranes or waterproofing where required.
Account for preparation, drying or curing requirements, follow-on trades and inspections.
Preparation often decides whether a commercial tiled finish performs as specified. A floor can look sound but still have unsuitable moisture conditions, contamination, movement, inadequate flatness or poorly coordinated interfaces.
Identify concrete, screed, existing coverings, timber-based systems or wall backgrounds. Record cracking, contamination, hollowness, movement, levels and relevant exposure.
Confirm the party responsible for moisture testing, strength checks, movement assessment and any necessary design approvals. Test and acceptance methods depend on the selected installation system.
Review removal, mechanical preparation, repairs, levelling, compatible boards, decoupling or waterproofing according to the approved build-up and manufacturer instructions.
Allow for product-specific curing, protection, inspection and subsequent trade access. Document acceptance of each area before the tiling programme begins.
The more complete the information, the fewer unresolved assumptions in the proposed tiling scope. Drawings and documents can be included through our secure enquiry form.
A site survey cannot guarantee that concealed defects will not be found. Moisture remediation, structural repairs and design changes need separate approval where outside the agreed preparation scope.
No. Depth, background strength, contamination, movement, moisture conditions and finished levels determine whether a levelling product is appropriate.
Responsibility must be agreed in the contract. The required test method and acceptance criteria depend on the substrate and chosen system.
Only when the product's specified curing and readiness conditions have been met, along with any relevant moisture and site requirements.
Send drawings, specifications and your working programme for review.