COMMERCIAL TILING TENDER CHECKLIST FOR MAIN CONTRACTORS

A reliable commercial tiling tender starts with defined responsibilities, not just a floor area and a tile size. The contractor and specialist need enough information to price preparation, procurement, site resources, installation and handover without hiding important assumptions.

Technical note: This is general project-planning guidance, not a specification or design approval. Check the current project documents, applicable standards and system manufacturers' instructions.

01 / PROJECT CONSIDERATIONS

Issue a consistent tender information pack

Provide the latest dimensioned plans, elevations, reflected details where relevant, finishes schedules, tile references, specifications, programme and pricing documents. State the drawing revisions and return deadline. If quantities are indicative, say who is responsible for measurement and how changes will be reconciled.

02 / PROJECT CONSIDERATIONS

Separate labour from the complete package

Make clear who purchases and delivers the tiles, adhesives, grout, trims, membranes, boards and protection materials. Identify unloading, storage, waste arrangements and replacement stock. A labour-only number should not be compared directly with an offer that includes materials, preparation, supervision and completion.

03 / PROJECT CONSIDERATIONS

Describe the condition of areas being handed over

Explain whether the work follows new screed, existing concrete, timber, strip-out or another trade. Include known moisture or level results, specified tolerances and access restrictions. Record any defects or unknown conditions as survey qualifications or provisional allowances rather than pretending they do not exist.

04 / PROJECT CONSIDERATIONS

Make programme and commercial terms explicit

Set out practical start windows, phased access, out-of-hours requirements, welfare and parking, material call-off dates and interface trades. Include payment terms, any retention, variation procedure and who may authorise additional works. Remote locations may require separately identified travel, accommodation and return-visit allowances.

05 / PROJECT CONSIDERATIONS

Agree a measurable handover

Identify inspection hold points, protection responsibilities, cleaning, snagging, warranties and required records. Decide how completed zones are signed off and who is responsible if other trades damage or obstruct them after acceptance.

The key takeaway

A properly assembled tender pack makes competing specialist prices easier to compare and reduces arguments about omissions once work starts.

Relevant service: Complete commercial tiling packages · All technical guidance